Service hotline:
0315-5913666(domestic)+1-304-960-1190(abroad)
Domestic > The Third Coal Preparation Plant of Datuhe Coking Company
26大土河焦化公司第三选煤厂.jpg
  • 26大土河焦化公司第三选煤厂.jpg

The Third Coal Preparation Plant of Datuhe Coking Company

Type: Coking coal preparation plant

Scale: 2.50Mt/a

Contracting mode: partial contracting, new construction projects

Process: The 50-0mm raw coal is fed into a three product heavy medium cyclone without desliming, classification, and pressure. The coarse coal slurry is sorted by the coal slurry heavy medium cyclone, the fine coal slurry is sorted by the flotation machine, the flotation clean coal is dehydrated and recovered by the pressure filter, and the flotation tail coal is concentrated by a two-stage concentration process. After the tail coal slurry water is concentrated by the thickener, it is dehydrated and recovered by a horizontal settling filtration centrifugal dewatering machine and a pressure filter combined with a closed loop washing water cycle, which is environmentally friendly and energy-saving.